|
Silopi Power Plant is near completion with Atilla Dural
The cooling stack in the Asphaltite-Fired Power Plant, of which the construction is continued in Silopi by Endem Group of Companies, was finished in a short period with the tower crane sold by Atilla Dural and the tower crane rented from the fleet of Duramak. The power demand of the region will be covered substantially with the 2 x 135 MW electricity generation capacity, when the project is completed.
click for details
Teknik Yapı preferred also Atilla Dural
Tower Cranes and AlimakHek construction hoists, from the fleet of Duramak, the rental company of Atilla Dural, were used in Evora, one of the most important and large scale projects of Teknik Yapı in Istanbul. The project with 5.000 residences in 44 blocks on an area of 300 decares in Tuzla was finished in a short period with our numerous construction equipment used at the worksite
click for details
“Best Project” Of 2010 ascended with us
Varyap Meridien’s preference is Dural/Duramak VARYAP
Meridien Project of Varlıbaşlar Holding was selected as the best project in numerous fields in the International Real Estate Awards in 2009 and 2010. Meridien, the award-thirsty project of Varyap, ascended at Ataşehir, which is one of the new popular locations in Istanbul with the use of AlimakHek construction hoists in the fleet of Duramak, the rental company of Atilla Dural. 6 Liebherr 154 ECH 6 and 1 Liebherr 130 ECB 6 model tower cranes were used in the project along with the construction hoists of Alimak Hek SC 20/30 TD, TPM 1300 SD and SC 450 20/30 DOL model.
click for details
1 2 3 4
|
|